2018 Jan IBM Official New Released C2010-595
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-595.html

IBM Maximo Asset Management V7.5 Fundamentals

Question No: 1

What is required to generate a forecast for an existing preventive maintenance record?

  1. Estimated next due date

  2. Last work order start date

  3. Last work order generation date

  4. Last work order completion date

Answer: C

Question No: 2

From which application tab. can a user change the status of multiple records at once?

  1. all tabs

  2. List tab

  3. Main tab

  4. Related Records tab

Answer: B

Question No: 3

An inventory manager wants to track the cost of items in a storeroom and wants to use the cost for the most recently purchased items when issued. Which costing method represents this requirement?

  1. LIFO

  2. FIFO

  3. Average

  4. Standard

Answer: B

Question No: 4

Which statement describes a work package?

  1. It is an activity with one or more child work orders or tasks.

  2. It is a collection of work orders that are placed under a new parent.

  3. It is a work order with more than one task to organize the order of work.

  4. It is a package of work orders that is placed under an existing work order.

Answer: D

Question No: 5

What if the projected forecast date for a preventive maintenance (PM) record occurs in an inactive season?

  1. The active season dates should be modified.

  2. The inactive season dates should be modified.

  3. The PM record is forecasted on the latest date in the next active season.

  4. The PM record is forecasted on the earliest date in the next active season.

Answer: D

Question No: 6

To which file format can report data be exported?

  1. CSV

  2. DOC

  3. TXT

  4. PDF

Answer: A,D

Question No: 7

What is the purpose of the Reorder Point when its value is reached?

  1. A special order item is reordered.

  2. The vendor is contacted for shipment.

  3. The inventory item should be reordered.

  4. The automatic reorder process is scheduled.

Answer: D

Question No: 8

Which two statements are true about a purchase order (PO) with the status approved?

  1. A contract reference can be added to the PO.

  2. The status of the PO can be changed to INPRG.

  3. The purchase order#39;s vendor information can be changed.

  4. In order to make changes to the PO lines, a revision of the PO must be created.

  5. In order to make changes to the PO lines, the status must be changed to WAPPR.

Answer: B,D

Question No: 9

If a user has a requirement to create a list of regularly occurring faults that affect assets or operating locations, their causes and possible fixes, which application should be used to achieve this?

  1. Safety Plans

  2. Failure Codes

  3. Ticket Templates

  4. Activities and Tasks

Answer: D

Question No: 10

Which statement is true about rotating items?

  1. Rotating items are consumable parts.

  2. Rotating items cannot be returned for repair.

  3. Rotating items can only be installed at a location.

  4. Rotating items can have an inventory value and balance.

Answer: D

100% Ensurepass Free Download!
Download Free Demo:C2010-595 Demo PDF
100% Ensurepass Free Guaranteed!
C2010-595 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.